500Mw Steam Boiler Specifications

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :500Mw Steam Boiler Specifications
  • Supply Capacity : 10 units/month :500Mw Steam Boiler Specifications
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • 4-Pass Steam Packaged Firetube Boiler - Johnston Boiler

    Drawings - 4-Pass Steam Packaged Firetube Boiler Notes: 150# Steam design shown, all dimensions given in inches. Fuel piping and/or optional boiler trim may increase overall width. Specifications subject to change to incorporate engineering advances. *May vary on low-NOx designs Connection & Opening Schedule Conn. Description Type QtyGet Price

  • Specification for 28A Series Boiler - Mestek

    The port connector will meet ASTM F-37 and ASTM F-36 standards for sealability and recovery; Sections shall be assembled with short draw rods, tightened to final torque after the section assembly is complete The boiler shall have an oval upper steam port with a minimum of 53.8 Sq. Ins. of free area above the normal water line to assure positive Get Price

  • BASIC WATER TREATMENT OF STEAM BOILERS

    May 02, 2000 · BASIC WATER TREATMENT OF STEAM BOILERS Steve Kenny and Dave Pope Chemco Water Technology Vancouver, WA This is a brief discussion on low-pressure steam boiler chemistry. It provides dry kiln boiler operators the tools to maintain an efficient and effective boiler chemistry program.Get Price

  • GLOBAL LEADER IN POWER & WATER

    8,500MW (2014) 3,500MW (2004~2008): - Vietnam Factory (Add 500MW/Year from 2009 to 2014 ) - New Investment in Changwon Factory (Add 2,000MW in 2009) MANUFACTURING Boiler Production History and Capacity Securing PlanGet Price

  • An Introduction to Treatment of Steam Boiler Water

    1. STEAM BOILER SYSTEMS 1.1 STEAM BOILER SYSTEM DEFINED. A steam boiler is an enclosed vessel that holds water and is heated by an external source that converts the water to steam. All steam boilers contain tubes that separate the water from the heat source. Steam boilers are described in this publication. 1.1.1 TYPES OF STEAM BOILERS.Get Price

  • 4-Pass Steam Packaged Firetube Boiler

    Drawings - 4-Pass Steam Packaged Firetube Boiler Notes: 150# Steam design shown, all dimensions given in inches. Fuel piping and/or optional boiler trim may increase overall width. Specifications subject to change to incorporate engineering advances. Connection & Opening Schedule Conn. Description Type Qty FW Feedwater Inlet 2.00 FNPT 2Get Price

  • Steam Boiler Specifications | Miura America

    Jan 15, 2014 · BOILER DRUM: Construction: Fusion welded Material specification: SA299 Design pressure: 204.9 kg/cm2 Maximum operating press: 193 kg/cm2 Thickness for straight portion: 195/165 mm Overall length of drum : 22070 mm …Get Price

  • Environmental Monitoring Report

    Mong Duong (2 x 500MW) Thermal Power Plant Project Page 9 of 40 February 2015 1 Initial firing by Diesel oil for Boiler Unit #2B x 2 Steam blowing out for Unit #2B x 3 Black out test for Unit #1 x 4 Black out test for Unit #2 x 5 Back energizing for Unit#2 x March 2015 1 Load swing test (350~450MW) for Boiler Unit #1 xGet Price

  • Case Study on Efficiency of Boiler and Factors Affecting It

    the most important types of performance of boiler steam power plant. Thermal power plant converts the chemical Requires 1000 metric tones coal to produce 500MW. It has 4 units of 210MW & 1 unit of 500MW. Its total electricity Fuel Specification The specification of a fuel source can immensely affect the efficiency of a boiler system Get Price

  • Steam Generators for CANDU

    findings of how the boilers should be rebuilt, I took early retirement in 1980. The fixes for the rebuild program generally followed the US design features and manufacturing processes of the very expensive Once-Through Steam Generator (OTSG). As these rebuilt boilers matured, service results showed that the life of the boilers was shortenedGet Price

  • Design and Operating Experience of the Latest 1,000-MW

    has advanced steam parameters of 24.1 MPa and 593°C/593°C for the first time in Japan. The 2,950-t/h coal-fired boiler for the unit was supplied by Babcock-Hitachi K.K. (BHK), who confirmed that the boiler met all performance specifications during the commissioning period. To achieveGet Price

  • CAST IRON COMMERCIAL WATER OR STEAM BOILER

    Boiler ratings are based on 12.5% CO2 on oil; 9.7% CO2 on gas, and .10 in. water column pressure at boiler flue outlet. 3. I=B=R net ratings shown are based on piping and pick up allowances which vary from 1.333 to 1.289 for steam and 1.15 for water.Get Price

  • CLEAVER-BROOKS

    750-94 (revised 2009) Model CB, CB-LE Packaged Boiler Manual i Model CB, CB-LE Packaged Boiler 750-94 Table of Contents CHAPTER 1 Basics of Firetube Operation 1-1 1.1 — Introduction 1-1 1.2 — The Boiler 1-4 1.3 — Construction 1-5 1.4 — Steam Controls (All Fuels) 1-6 1.4.1 — Operating Limit Pressure Control 1-6 1.4.2 — High Limit Pressure Control 1-7 1.4.3 — …Get Price

  • Boilers - Simons Green Energy

    Gas / Oil fired Steam Boilers – VWT series. SIZE: 60 to 1250 kW. Highly efficient water-tube steam boilers with features and system options designed to meet the client's specification. With steam capacities ranging from 92 to 1,956 kg/hr, the VWT series are available in natural gas, LPG or diesel firing configurations.Get Price

  • Mitsubishi Hitachi Power Systems Ltd. Boiler Business and

    steam temperature was then increased to improve the plant efficiency, with a goal of materializing more environmentally-sustainable plants. In 1995, we supplied a USC coal-fired boiler with a reheat steam temperature of 593°C to Unit 1 of the Nanao-ohta Thermal Power Station of Hokuriku Electric Power Company (500 MW, 24.1 MPag and 566/593°C).Get Price

  • Pressure Parts 500MW Boiler.pptx | Boiler | Chemical

    Boiler Internals Mainly Consists of: - From the riser tube steam and water mixture flows into the Drum through a narrow annulus formed by a shroud extending along the length of the Drum Shell called the Separating Chamber. This is a welded construction formed by Baffles. These surfaces direct the flow of substances either to prevent or o Get Price

  • Packaged Steam Boilers - Thermon

    Packaged Steam Boilers Packaged Steam Boilers Description Caloritech™ electric steam boilers provide safe, versatile,easy to use heat sources for low or high pressure steam in industrial, commercial or space heating applications. These boilers can be used as the sole source of steam or may be readily adapted to dual energy systems.Get Price

  • Boiler Specifications Miura America Co., Ltd.

    Multiple water tube, once through, forced flow, steam boiler 100 70-150 3450 3.348 196 2:1 50.0% Air and Fuel Requirements Page 1 of 2. Boiler Specifications Miura America Co., Ltd. Economizer Drain (If Equipped) in NPT Main Steam Outlet NPT Flange Safety Valve Outlet9 in NPT Drip Pan Elbow Vent in NPT Drip Pan Elbow Drain in NPTGet Price

  • Boiler Capacities - Engineering ToolBox

    Since the amount of steam delivered varies with temperature and pressure, a common expression of the boiler capacity is the heat transferred over time expressed as British Thermal Units per hour. A boilers capacity is usually expressed as kBtu/hour (1000 Btu/hour) and can be calculated as. W = (hg - hf) m (1) where. W = boiler capacity (Btu/h, kW)Get Price

  • Pressure Parts 500MW Boiler | Boiler | Energy Technology

    fFor the construction of boiler parts subjected to pressure and their integral attachment, the designer takes into account several factors. ffTUBE DETAILS All economizer tube are of 51mm X 5mm. Located in the boiler back pass. It is composed of three banks of 130 parallel tube elements arranged in horizontal rows.Get Price

  • Series 500 High Pressure Steam Boiler Sample Specifications

    Series Euro Steam Boiler Sample Specifications (100-2000 HP, 15-300 Psi) Boiler Characteristics. The boiler shall be Hurst Boiler & Welding Co., Inc., Euro Series hp designed for psig. The maximum operating pressure shall be and the minimum operating pressure shall be psig.Get Price

  • Feasibility Study of the CCS Deployment to Australia by

    Steam temperature (HPT/IPT inlet): 600/600℃ Coal Properties Specifications of water treatment system depends on usage of water. 18 500MW Oxyfuel Power Plant ASU Boiler CPU CO 2 Flue Gas Treatment Air 345MWO 2 Non-condensable Gas H 2 O N 2Revenue Coal FertilizerGet Price

  • Steam Boilers - Chromalox, Inc.

    Electric Hot Water & Steam Boilers — General Specifications Model Description Operating Pressure (psig) Temp. (°F) kW Mbh2 Vessel Pressure Rating (psig) Connection Type CMB Compact Steam Boiler 0 - 90 212 - 331 3 - 15 10 - 51 100 NPT CES-B Vertical Steam Boiler 0 - 90 212 - 331 6 - 180 21 - 614 100 NPTGet Price

  • Project Standards and Specifications Steam Boiler Systems

    Standard Technical Specification for Sub- critical Thermal Power Project - 2x(500MW or above) Main Plant Package iv Clause No. Description Page No. 3.11 Boiler Feed Pumps 3- 50 3.11.1 Sizing criteria 3- 50 3.11.2 Design aspects 3- 51 3.11.3 Other requirements 3- 55 3.11.4 Mechanical seals 3- 56 3.11.5 Gear boxes 3- 57Get Price

  • details of boiler in the thermal power power plant in ward

    Company Profile. Offering of insulation jobs of power plants, sponge iron plants, refineries, . Provide details like product specification, usage / application etc for best quotes. first ultra-supercritical steam system, which began operation at the American through boilers in the 1920s as boiler and power plant engi- neers envisioned the .Get Price

  • Steam Turbine - Department of Energy

    the boiler, steam loop, and controls. Non-fuel O&M costs range . from 0.6 to 1.0 ¢/kWh for the three steam turbines shown in Table 3. Similar to capital costs, there are economies of scale, and the O&M costs decline on a per kWh basis as the steam …Get Price

  • Steam Power Plants

    Boiler Steam Turbine Generator Steam Fuel Steam Factory Electricity Boiler Steam Turbine Generator Steam Fuel 3-4 From Design to Delivery of an Entire Power Generation Facility Integrated Customer Service A steam power plant consists of a boiler, a steam turbine, a generator, and other auxiliaries. The boiler generates steam at highGet Price

  • Literature and Specifications - Industrial Steam Boilers

    Clayton Steam Generators are available in many sizes and as portable steam boilers. Many are available as medium pressure steam boilers and high pressure steam boilers for sale. They come with several benefits above traditional water tube and fire tube boilers. Please browse our Literature and Specifications. For more information about Clayton Get Price

  • Environmental Monitoring Report

    Mong Duong (2 x 500MW) Thermal Power Plant Project Page 9 of 40 February 2015 1 Initial firing by Diesel oil for Boiler Unit #2B x 2 Steam blowing out for Unit #2B x 3 Black out test for Unit #1 x 4 Black out test for Unit #2 x 5 Back energizing for Unit#2 x March 2015 1 Load swing test (350~450MW) for Boiler Unit #1 xGet Price

  • STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL …

    Construction of 500 MW Steam Boiler - SlideShareGet Price

Discount
7X24 Online